2024 Ultimate Climbing Helmet Guide - From Bouldering to Alpine Adventures
2024 Ultimate Climbing Helmet Guide - From Bouldering to Alpine Adventures 2024 Ultimate Climbing Helmet Guide - From Bouldering to Alpine Adventures
Cart(0)
Home Motorcycle Helmets Retro Rider Helmets
Product Details

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - White
  • White
  • X-Small/Small
  • Medium/Large
  • X-Large/2X-Large

$ 119.99

$ 35.70

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
2024 Ultimate Climbing Helmet Guide - From Bouldering to Alpine Adventures
Your cart is currently empty.